Construction of а house in Costa del Sol, Marbella or Andalusia, Spain

HOUSE CONSTRUCTION in Costa del Sol – USEFUL ADVICE

There are people who have several villa or houses. There are also those who own entire holiday villages and gated complexes. Few people own houses for tens, even hundreds of millions of dollars. But the truth is that most people do not have such options and build a villa once in their lives. For them, it’s a dream, and all dreams can come true – if we have the courage to pursue them. It seems easy and simple to build a house, but alas, things don’t work out that way. The internet is full of information on what the steps are from finding the right plot to choosing a prime contractor. You will also easily understand what documents you need to own and which institutions you need to deal with in order to obtain a construction permit. I will say so. Things start with choosing land, of course, unless you already have one. Preliminary research is paramount. There are too many options on Costa del Sol – Estepona, Marbella, Calahonda, Mijas, Fuengirola, Torremolinos or Malaga. The plot in Spain should be preferably in regulation. There are really many things written about this topic, so I’ll synthesize the most important ones.

Location comes first. If the land is somewhere in the depths of Andalusia or Spain, where nothing is bad, then the value of construction will increase significantly because of the great distance that machines, trucks, cars, etc. need to travel. It is likely that the site will be difficult to access, further complicating construction. For example, if the concrete truck and concrete pump cannot reach the site, you may need to build a road. Otherwise, the concrete will have to be prepared on site or a stationary concrete pump will be used, which will dramatically change things. It is also important that the property has electricity and water. More of the plots in Costa del Sol – Estepona, Marbella, Calahonda, Mijas, Fuengirola, Torremolinos or Malaga have electricity and water. But for example, if there is no water, drilling will be required, which will result in additional costs. And it is not known how watery the area is.

The soil, the terrain and the yard are definitely not for an underestimation. The most sustainable soils for construction are rock, gravel and hard sandy clay. Unfavorable and risky soils are those in landslides, rifts, such with high groundwater, loess, silt and some others. This in itself leads to the construction of more serious foundations, which would significantly increase the cost of building the villa in Costa del Sol – Estepona, Marbella, Calahonda, Mijas, Fuengirola, Torremolinos or Malaga. Displacement is also irrelevant. A large slope would definitely be reflected in the price of the foundation than in the case of flat terrain. And if there are steep sections of the property, retaining walls may need to be made. The size of the yard / plot also matters. The smaller yard restricts the situation of the house and would hamper construction to some extent. The presence of many trees and their removal would also affect the price.

Examine your neighbors! Many people underestimate this fact and regret it over time. I’m not just talking about conflicting and unfriendly neighbors, you should also avoid properties near the ghetto. During construction, iron is most appetizing, but other building materials and power tools can disappear. But this is just the tip of the iceberg, consider if you would ever live there. Also, examine as far as possible whether near the property in question will be built in the foreseeable future. It may happen that once you have gone through the nine circles of hell and have finally moved into your new home and expect a well-deserved peace and quiet, your neighbor has given the land to an investor or contractor to be erected a block.

Let’s talk in numbers.

It is crucial to determine what kind of budget you have. If you have set aside EUR 80,000 and want to build a house of 200-220 m2, this is not realistic. This money will only go to a 140-150 m2 house without a basement with more ordinary materials. Of course, there are still builders who say they can build a turnkey house for 350-400 EUR / m2. Usually, the sites where you will find a similar price, the excavation and the foundation of the house are not included. Also, the plumbing, which is pledged in advance to the plate, is not included. Hydro and thermal insulations, which go with the base of the building, do not enter, and without them it cannot. No backfill is included. Drainage may also need to be built. All these things are at least another 150 EUR / m2 of living area. It’s like selling you a new car with all the extras, but … without the chassis (suspension, shock absorbers, springs, wheels, wheels, tires, etc.); it doesn’t sound serious and it certainly sounds misleading. That way you can’t even make an estimate.

The price of € 350 / m2 turnkey was current years ago when there was a crisis and the sector was stagnant. Therefore, much of the information on the forums is already old. Then really a house could be built for that money. Now banks are lending home and mortgage loans. This leads to a serious shortage of labor, and hence labor costs are much higher. The cost of materials is also rising, but demand determines supply. Let’s not forget the irresistible inflation. The safety and healthy measures have become very popular lately, without which construction can no longer begin even if you have a building permit. This requires a number of things that can make temporary construction difficult and difficult – a tire washing site, a waste pit, a fence enclosure of the entire property, cargo elevators, a toolbox, a mobile toilet, a waste container , safety rails, n- number of signs and signs, etc. Since the beginning of 2020, there are also others mandatory requirements such as licenses and permits in regard with coronavirus COVIT-19 for the construction of a villa in Costa del Sol area – Estepona, Marbella, Calahonda, Mijas, Fuengirola, Torremolinos or Malaga, Spain.  Of course, this is another few thousand euros above.

So, at the moment, at least 500-600 EUR / m2 is worth the complete completion of a villa (turnkey), even if there are no agravating circumstances. But in general, avoid considering the value of your villa in Euros per square meter, for example rough construction of 220 EUR / m2 and finishing works of 280 EUR / m2. So it is neither professional nor will you get the real amount for the construction. This can serve as a very rough initial benchmark in Andalusia. A professional offer is made on the basis of a detailed quantitative account, but it will be discussed later. However, if you really do not have the budget but want to have some space, everything must be well planned and zoned. Or put another way, use each square as intended. For example, the bedroom will not be 17 m2 and will be 13.5 m2, but you will have another bathroom or closet. You may also be deprived of a garage for the volume of the house, but you will have an office, gym or extra guest room. However, if you want to have everything you dreamed of but don’t have enough money for at the moment, it is better to wait another year or two and then start. Do not be fooled by the tempting proposals for cheap construction. On the other hand, do not delay until the start of your house. Although some temporary construction stagnation, overall property prices are going up. Hence the prices of construction services. In the long term the trend is upward. Building a new house (including the purchase of land) is no cheaper than buying a ready-made house. But at least build it to your taste and design; do not comply with the welded position. And finally, if an apartment in Malaga costs 1300-1800 EUR / m2, then it makes sense to build a new and modern villa in Costa del Sol or in Andalusia.

Choosing the right designers is a key point. These are architects, constructors, specialists in the “Electro”, “plumbing”, HVAC, 3D renderers and more. You should not save money  for good projects, it can cost expensively later. The idea is not just to design a modern and charming house, it is also important to protect the interests of the investor. What do I mean? Many designers rely on too much reinforcement, which will not change the strength of the structure, but will significantly increase the cost of project implementation. That is, they reinsured the already reinsured. I agree that safety and security are first and foremost, and there are no two opinions on the matter, but a golden environment must be found. And because it’s the hardest thing, designers just put in a lot more iron. They use software with predefined higher values ​​and therefore kindly explain that the higher quantity is a consequence of complex program calculation. The truth is, not they, but you will pay the bill and that you will find it out after the fact. And here comes the question of how much reinforcement to put into the project? The normal amount of iron for non seismic zone such Costa del Sol, Andalusia and all Spain is 20-25 kg / m2 of the total area of ​​the house. Let with the reinsurance be 30 kg, but I often meet design projects with iron 40-50 kg / m2. At the current prices of reinforcement workpiece, for a medium sized house, this difference can amount to 10,000 euros. That’s what a mid-range kitchen made of MDF is worth. The work will also be more expensive, as the masters will have to tie more fittings, and the lead time will be increased. Last but not least, don’t underestimate the price of iron. It is the most navigable. Winter reinforcement as a material can cost 1.2 euro/ kg excluding VAT, but if we enter the season it can jump by anything by 20-30 cent. The price can be influenced by some geopolitical factors and crisis such as coronavirus, COVIT-19 pandemic.

Another important thing is to have good communication between the different designers. I have seen projects with considerable discrepancies between architecture and construction. This will definitely complicate the construction process. The often mentioned plan for organization and safety is not at all in keeping with the actual situation. It turns out that neither a concrete pump nor an excavator can enter the rear of the property because of the ditch that clogs the entrance for example. But if according to the project it is given that each machine will pass and there will be enough space to accommodate all the temporary construction, as they painted it. Along with the main expenditures, comes the construction waste  issue. Then keep in mind that the garbage that will be generated during construction will also cost a certain amount. Especially when it comes to extensions and upgrades to existing homes. Especially when the old part is overhauled. There, the number of containers may prove to be more than you initially thought, including the waste removal work.

Once the design team has been selected by the investor, it is time to consider several conceptual designs. As one of them will be the basis for the design of the villa. Keep in mind that the more broken a house is, the more complicated its construction will be.

With or without a basement. You need to consider whether you need one. If there is a basement, cellar or underground garage, the house is appreciably expensive. It digs deeper, more soil is exported, the backfill is larger, additional formwork, reinforcement, concrete, waterproofing, thermal insulation, etc. may also be required. Drainage may also be required. All this raises the cost of the villa.

To give an example: a house that is 100 m2 on a striped foundation, built with standard materials will cost a turnkey price of about 600 EUR / m2, or approximately 60000 EUR. However, if there is a basement, this price can go up to EUR 100 per square meter or your turnkey will go above EUR 700 / m2, ie EUR 70000. These are nearly 10000 euro above and in a small house of 100 m2, which is at most a two-bedroom apartment. Keep in mind that a small house would cost more per square meter because of the smaller workload. The organization is the same as for a larger house.

The roof is the fifth facade of the villa. Its appearance also matters, the more complex it is (the number of slopes and tufts), the higher its price. Roofs with a greater slope (over 40 °) also cost more. They must be scaffolding or using a climbing method. The price is also higher for roofs with longer eaves, as more material is needed. The construction of a brand new roof goes about 150-180 EUR / m2. Or if the last slab is 100 m2, you multiply by a factor of 1.4 and you get a roof of 140 m2, or roughly the roof will cost about 11500 – 12000 EUR. Of course, it matters what the tiles are. If they are stone, ceramic or titanium-zinc bitumen tiles the price will definitely be higher. Metal tiles and ceramics are also more expensive than traditional tiles. The wood should be dry and impregnated. On the market in Marbella or Malaga mass sell raw at a lower price.

Concrete and bricks also contribute to the price. For example, concrete grade C 25/30 costs more than concrete grade C 16/20. There the difference is about EUR 10 per cube. For an average size house of 200 m2, this is about 100 m3 of concrete or more expensive by about 1000 EUR. Although a negligible difference, concrete class C 10/12 is also more expensive than C 8/10. Last but not least, the distance from the site to the concrete site is also important, as is the accessibility to the site. If the street is narrow, the normal concrete pump will not be able to enter and must be operated with cougars (concrete pump and concrete truck in one), a stationary concrete pump, or, as a last option, a concrete mixer. Bricks are also important. Wienerberger POROTHERM are more expensive than the traditional bricks.

Cooling is another important factor to consider.  You can choose a normal heat pump for example. But if you want to build and have more energy efficiant villa, passive house or off-grid villa than you could buy heatpump such as land  water type. It draws energy from groundwater, which is around 14 ° C year-round. It can be combined with solar panel or PV photovoltaic panels to heat the water in the boiler or to produce electricity. The investment of such a heat pump amounts to EUR 7000 – 10000. But it is one of the most economical options for cooling and heating if there is such need. Of course, you can choose regular electricity air conditioners.A wastewater treatment plant may also need to be installed if there is no sewerage nearby. It’s a good idea to plan this cost, since a high-quality wastewater treatment plant for a family of four costs around EUR 6000-8000. The funnel pit option is also a variant, but first it is an older wastewater technology and not everyone likes this idea, and secondly it is not always more economical. The point is that for such a facility there is a lot of formwork, concrete and fittings should be made as well. You could decide to put plastic tank but it also cost money. In other words, the work labour of building a septic tank is no small feat.The fence, although indirectly related to the construction of the house, is also good to design according to your needs. For example, if you want to see the street and interact with your neighbors while in the yard, you will stop at an openwork fence. If you prefer solitude and occasional passers-by to not peek into the yard, then a solid solid fence is a better option. The price difference is also noticeable. An openwork fence with net and foundation, no higher than 60 cm and depth up to 100 cm, turns out to be about 110-130 EUR / m. A solid fence with a similar foundation, but constructed and bilaterally plastered with decorative plaster, goes from 50 to 80 euros above a linear meter.The above are just some of the things that can change the price of a house to a greater or lesser extent. The thickness and type of thermal insulation, the finishing decorative plaster, the plinth of the house, the lightning protection installation, the windows, the doors, the number of chimneys, the flooring, the suspended ceilings, the way of wiring, the brand of keys and contacts, are also important, the brand of sanitary, the number and size of bathrooms, the presence of a fireplace, the luxury of the kitchen, the furnishings and many more.
CHOICE OF A CONTRACTOR
Selecting a construction company in Marbella or Malaga is no less important than the right designers. I would even say it is more important. When you already have a building permit or you are about to have it soon, it’s time to be ready with the choice of  a contractor. The first thing one wonders is whether to work with a company or directly with a construction team. On the subject of Company or Masters what is important to know? It is important for the company that you have stoped to have a certificate and registration. There are many companies and crews who claim that even without a license everything will be ok, but this can create additional problems in completing the building works and legalizing the house.

When collecting offers, look at them very carefully.

See exactly what is included and what is not, read the notes carefully, look at the deadlines, with or without VAT being the price, what guarantee they give, etc. It is good when comparing several offers for building a villa in Costa del Sol or Andalusia region that they are identical. Otherwise, you may get a significant price difference and be left with the impression that a cheaper offer includes everything you need to make your home a fact. And then it turns out that you need to invest a lot more money to finish your house in Costa del Sol. Therefore, in order to have the same basis of comparison, require the designers a detailed quantitative account – bill of quantity. I say detailed because I have seen a lot of lean ones. They are required to give you a detailed quantative bill, it goes into the design cost. I doubt that any builder will start calculating quantities without this service being paid, and it will take him time that he probably doesn’t have. Even if the quantities received by the designer are not absolutely accurate, they will be a good basis for a bid and a contract. If certain construction works are not included in one offer and are detailed described in another, then ask the first builder if these items are included in the price or you will have to pay extra for them. You will also know from the answer what the intentions of the questioned builder are. Whether it makes you a discount by including them in the price or just wants to win you with a lower offer. In fact real quantities are always updated in the construction process, they are easily demonstrable and could be proved after completion. But in this scenario it will be too late and these works will not be predicted in your budget.

Also, provide a structural design, architectural design, explanatory notes, plumbing, electro, HVAC, geodesy, geological report, 3D visualization and everything else related to the building of your house in Spain. In this way, the companies you are staying in will be able to take the time to look through all the design documentation, then come up with a detailed and accurate quote. Of course, there are builders in Marbella who are just going to throw up any prices, as they will not care to delve into the matter, but I suppose you are not looking exactly for a contractor who suits negligible from the start. It’s good to split the construction into stages! The first is a rough construction contract. Once the reinforced concrete structure and the roof have been completed, new offer must be prepared  signed with the same builder (of course, with another one if you are not satisfied from the first one) for the completion of the house.  You can safely include the bricks in the first stage of construction, as well as the wall insulation, along with the exterior backfill. Turnkey direct execution or lamp sum contract is not always a good idea. This includes a larger time frame, through which many things can change. For example, the prices of materials and labor should be appreciated. Or worse weather conditions and delay for example. In addition, preparing a quote for finishing work with all the details will take much more time and the likelihood of an error or inaccuracy is likely. It is not uncommon for many things to be changed, added or dropped at the request of the investor, and this can radically change the finishing works set out in the contract and the offer. Once you have selected a builder in Marbella, it is good to document that everything is in order and there is electricity and water provided. In short, to have a front for work. It is good for the construction company in Costa del Sol to know earlier, say one month, that it will run the house so that it has time to organize its team and mechanization.

Here is the time to say something about pricing. The unit prices of a company are far from just materials and labor. Many additional costs are found below the surface directly and indirectly related to the construction of a house in Andalusia. These are:
– Accounting expenses
– Social security
– Income tax in Spain
– Bank charges
– Certificate
– Professional liability insurance
– Occupational accident insurance
– Occupational medicine
– Office, telecommunications, technology, internet, supplies, stationery
– Technical Manager (salary and insurance)
– A temporary fence
– Information table
– A container where the technician will be located and the workers will be changed
– The guardian of the object
– Chemical toilet
– Trash can
– Construction of a temporary fountain
– Making a temporary electrical board
– Fuel consumption and depreciation of vehicles
– Costs for mechanization and power tools and depreciation
– Low valuables (discs, drills, scissors, scissors, chains and oil for gasoline cutters, gloves, safety masks and goggles, etc.)
– Sidewalk right (if the site borders the sidewalk)
These are a large part of the extra costs that a company needs to make to build a house or apartment building in Spain. Even if some of them are saved or distributed to other sites, the kernel of additional costs remains. Usually they are 90% of the work, but they often go out more, especially if things are not done right. Let us not forget that, among other things, a company has the know-how, creates the whole organization, bears legal and moral responsibility, and gives a guarantee in the end. All this is also included in the unit prices. Last but not least are time, energy, nerves, risk, lost profits, unrealized gains and other indirect losses. Each of these things has its price.

30% ABOVE – MYTH OR NOT

You may have often heard remarks like you should calculate absolutely everything, put 30% on top and get the real value of the villa in Costa del Sol. It doesn’t sound reassuring, but the truth is, it often happens. Especially if you come across the wrong designers and builders. Even if one is a true coryphaeus in the profession, who practices and defines himself as a good psychologist, that does not mean that he will do well with the whole process of building a house. Things are not just about doing arithmetic well, using a calculator or even Excel. Even keeping track of every expense you make is sometimes not enough. There are far too many human factors involved. During the realization of your dream house in Andalusia you will meet a variety of people. These are brokers, bankers, designers, surveyors, geologists, various government institutions, entrepreneurs, technicians, craftsmen, general workers, distributors, designers, furniture makers, insurers, neighbors, relatives and anyone else. They may also increase the cost of construction materials, especially fittings. And sometimes you may be tempted to replace one thing with another. For example, instead of PVC windows, put aluminum or wooden. As the saying goes, “appetite comes with eating” but goes away when they bring the bill. Whatever the reason for the increase in investment, the truth is that one should always have one in mind and the financial reserves provided. It is also good to arm yourself with buffalo patience. Finding the right contractor in Marbella can take time. Labor savings are the easiest to make but also the hardest to handle subsequently in Spain.

WHAT IS THE MOST ECONOMIC OPTION FOR A VILLA IN COSTA DEL SOL?

Whether it is a monolithic construction or a prefabricated house, the practice shows that a two-storey house with striped foundations on flat terrain, with a two-story roof, with utilized under-roof space is the most economical investment. Also, the form must be as simple as possible. The house looks like a cube and there are no balconies, terraces, bay windows. You can additionally read more about why a two-storey house comes out cheaper than a one-storey house.

MONOLITHIC CONCRETE OR PREFABRICATED HOUSE IN MARBELLA OR COSTA DEL SOL?

This is also a fundamental question that every prospective homeowner must address. Personally, I, as someone who has experience in both types of construction, will say a few things. First, it is not absulute true that prefabricated houses come out cheaper than monolithic concrete ones. It all depends on the architecture, the structure, the materials involved and who the contractor is. The way in which prefacricated houses are advertised, which cost are 350-400 EUR / m2 is misleading. This is also one of the main reasons many people do not care because they have multiplied the square by the wrong number from the very beginning. The foundations and excavations mentioned earlier in the article do not go into this eye-popping price. Waterproofing, thermal insulation, drainage, sewage pipes at the bases, backfill, the design part of the structure are also excluded. All in all, it’s all about marketing. Therefore, I would safely say that the prices of the two types of construction – solid monolithic and prefabricated are offset. It is estimated that one turnkey prefabricated house in Costa del Sol costs over EUR 500 / m2. It’s a matter of personal preference which of the two types of houses you would stay at. Of course, there are houses built on other construction technologies, which could be built in Costa del Sol. Some of them are steel villas with thermopanels, passive houses, off-grid villa, movable houses, residential containers, wooden villa, campers (houses on wheels), timber houses and others which could be applicable in Marbella and region of Andalusia, Spain.